Recipe Depletion & Costing Matrix
The following matrix summarizes how these settings should be configured by asking two questions that must be answered for each recipe product:
- Is the recipe produced on-site using component products from this location?
- If No, then Production Type = “To Order” and POS Decrement= “Item”
- If Yes, then Production Type= “Production”
- For recipes being produced on site, is the Net-Chef Daily Prep module being used to do so?
- If No, then POS Decrement = “Component”
- If Yes, then POS Decrement = “Item” (Daily Prep depletes components.)