Recipe Depletion & Costing Matrix

The following matrix summarizes how these settings should be configured by asking two questions that must be answered for each recipe product:

 

  • Is the recipe produced on-site using component products from this location?
  • If No, then Production Type = “To Order” and POS Decrement= “Item”
  • If Yes, then Production Type= “Production”

 

  • For recipes being produced on site, is the Net-Chef Daily Prep module being used to do so?
  • If No, then POS Decrement = “Component”
  • If Yes, then POS Decrement = “Item” (Daily Prep depletes components.)